摘要 综述了大规模管道长输CO2技术的国内外发展现状。CO2管道输送技术与石油天然气管道输送技术相似,主要差别在于CO2输送管道对于防腐保温和运行操作的特殊要求。我国目前尚未建造CO2长输管道,还需要积极引进国外先进技术、加强产学研联合开发,运用橇装试验装置进行现场工程试验,以迅速填补国内空白。根据我国的CO2排放和地质储存状况,CO2捕获与封存技术的分析成本低于国际碳排量交易价格,发展大规模管道长输CO2技术具有重大经济环保价值和战略意义。 The paper summarizes the technology development actualities of large-scale pipelines transporting CO2 at home and abroad. CO2 pipelining and oil pipelining are similar in transporting technology, however major difference for the former is the specialrequirements in corrosion control and/or insulation and operation of CO2 pipeline. In China, long-distance CO2 pipeline have not yet been constructed, and next work to be done is to introduce foreign advanced technology and strengthen joint development on relative production, science and research; and skid-mounted testing equipment can be utilized in field engineering experiment inorder to fill in the gaps in the field rapidly. In the light of CO2 emissions and geological storage in China, analysis cost for CO2 CS (capture and seal-up for safekeeping) technology is lower than the international transaction value on carbon emissions, therefore, the technology development in CO2 transportation through large-scale pipeline is of great significance for environmental protectionand strategy.
出处 《油气储运》 CAS 北大核心 2010年第2期86-89,92,共5页 Oil & Gas Storage and Transportation
关键词 二氧化碳 捕获 封存 管道输送 碳排放 地质储存 CO2, capture, seal up for safekeeping, pipeline transportation, carbon emissions, geological storage
  • 相关文献

参考文献23

  • 1IPCC. Climate change 2001: The third assessment report of the intergovernmental panel on climate change [R ]. Cambridge : Cambridge University Press, 2001 : 6 - 11.
  • 2UNFCCC. Kyoto Protocol to the United Nations framework convention on climate change[R]. FCCC/CP/ 1997/ L. 7/ Add. 1, Bonn, 1997: 2-18.
  • 3Bachu S, Adams J J. Sequestration of CO2 in geological media in response to climate change: capacity of deep saline aquifers to sequester CO2 in solution[J]. Energy Conversion and Management, 2003, 44(20): 3151 -3175.
  • 4Golomb D. Transport systems for ocean disposal of CO2 and their environmental effects[J]. Energy Conversion and Management,1997, 38 ( Suppl ): 279-286.
  • 5Eli Kintisch. U S BUDGET: Science Wins S 21 Billion Boost as Stimulus Package Becomes Law[J]. Science, 2009, 323 (5917):992 - 993.
  • 6John Gale, John Davison. Transmission of CO2-safety and economic considerations [J]. Energy, 2004, (29) : 1319 - 1328.
  • 7IPCC. 2005: Special report on CO2 capture and storage[R]. Working Group Ⅲ of the Intergovernmental Panel on Climate Change. Cambridge, United Kingdom and New York, NY, USA: Cambridge University Press, 2005:442.
  • 8Dan Charles. ENERGY RESEARCH= Stimulus Gives DOE Billions for Carbon-Capture Projects[J]. Science, 2009, 323 (5918):1158.
  • 9谢尚贤,韩培慧,钱昱.大庆油田萨南东部过渡带注CO_2驱油先导性矿场试验研究[J].油气采收率技术,1997,4(3):13-19. 被引量:55
  • 10李小春,方志明.中国CO_2地质埋存关联技术的现状[J].岩土力学,2007,28(10):2229-2233. 被引量:26

二级参考文献12

  • 1Turkenburg W C. Sustainable development, climate change, and carbon dioxide removal (CDR) [J]. Energy Conversion and Management, 1997, 38(Suppl):S3-S12.
  • 2Golomb D. Transport systems for ocean disposal of CO2 and their environmental effects [J]. Energy Conversion and Management, 1997, 38 (Suppl) : S279-S286.
  • 3Perry R H. Perry ' s chemical engineers ' handbook[Z]. New York: McGraw-Hill, 1999. 10. 1-10. 152.
  • 4Kruse H, Tekiela M. Calculating the consequences of a CO2 pipeline rupture [J]. Energy Conversion and Management, 1996, 37(6-8): 1 013-1 018.
  • 5Peters M S, Timrnerhaus K D, West R E. Plant design and economics for chemical engineers [M]. 5th ed. New York: McGraw-Hill, 2003. 485-535.
  • 6Coker A K. Determine process-pipe sizes [J]. Chemical Engineering Progress, 1991, 87(3): 33-39.
  • 7谢尚贤,韩培慧,钱昱.大庆油田萨南东部过渡带注CO_2驱油先导性矿场试验研究[J].油气采收率技术,1997,4(3):13-19. 被引量:55
  • 8高德利.21世纪油气钻井技术展望[J].石油化工动态,2000,8(2):31-34. 被引量:12
  • 9丁泉,申超,王中平,李钢.制氢装置副产CO_2的回收与利用[J].石油化工技术经济,2000,16(5):24-29. 被引量:5
  • 10郑新权,汪海阁.中国石油钻井技术现状及需求[J].石油钻采工艺,2003,25(2):1-4. 被引量:24

共引文献97

同被引文献195

引证文献29

二级引证文献143

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部