集装箱码头装卸系统集成调度的建模与优化 被引量:20

Modeling and optimization of the integrated scheduling problem of container handling system
原文传递
导出
摘要 为提高集装箱码头作业效率,在码头集装箱卡车作业能力充足的条件下,对集装箱码头作业装卸系统集成调度问题进行了研究.针对集装箱码头装卸作业的特点,提出了装卸作业的预定义顺序约束、作业次序依赖的设备调整时间及岸桥碰撞干涉约束等,并在此基础上建立了整数规划模型.针对这一模型设计了两阶段启发式算法对问题进行求解.通过在数值实验中将结果与低界相比较,证明该算法效果良好.特别对于规模较大的问题,算法也可以进行有效的求解. On the assumption that the capacity of inner trucks was sufficient,the integrated scheduling problem of the container handling system was studied to improve the operation efficiency of container terminals.Based on the characteristics of container terminal operations,pre-defined operation constraints, sequence-depended setup time and interference constraints for quay cranes were defined and an integer programming model was proposed for the problem.A two-stage heuristic algorithm was developed to solve the problem.The numerical experiments show the algorithm effective and efficient comparing to the lower bound,particularly for cases with large scales.
作者 梁亮 陆志强
出处 《系统工程理论与实践》 EI CSSCI CSCD 北大核心 2010年第3期476-483,共8页 Systems Engineering-Theory & Practice
基金 国家自然科学基金(70771065) 上海市浦江人才计划(07PJ14052)
关键词 物流工程 集装箱装卸系统 集成调度 启发式算法 logistic engineering container handling system integrated scheduling heuristic algorithm
  • 相关文献

参考文献16

  • 1Vis F A I, de Koster R. Transshipment of containers at a container terminal: An overview[J]. European Journal of Operational Research, 2003, 147(1): 1-16.
  • 2Pererofsky R I, Daganzo C F. A branch and bound solution method for the crane scheduling problem[J]. Transportation Research Part B, 1990, 3(24): 159-172.
  • 3Daganzo C F. The crane scheduling problem[J]. Transportation Research Part B, 1989, 23B(3): 159-175.
  • 4Ebru K Bish. A multiple-crane-constrained scheduling problem in a container terminal[J]. European Journal of Operational Research, 2003, 144(1): 409-417.
  • 5Kim K H, Kim Y K. Routing straddle carriers for the loading operation of containers using a beam search algorithm[J]. Computers & Industrial Engineering, 1999, 36(1): 55-68.
  • 6Ng W C, Mak K L. Yard crane scheduling in port container terminals[J]. Applied Mathematical Modelling, 2005, 29(3): 263-276.
  • 7Chen L, Bostel N, Dejax P, et al. A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal[J]. European Journal of Operational Research, 2008, 181(1): 40-58.
  • 8Lau Y K H, Zhao Y. Integrated scheduling of handling equipment at automated container terminals[J]. International Journal of Production Economics, 2008, 121(2): 665-682.
  • 9张婕姝.港口生产调度仿真模型[J].上海海事大学学报,2005,26(2):42-46. 被引量:9
  • 10张海霖,江志斌,许泓.集装箱港口集疏运调度系统作业模式的仿真分析[J].上海交通大学学报,2006,40(6):1024-1030. 被引量:14

二级参考文献55

共引文献86

同被引文献196

引证文献20

二级引证文献102

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部