期刊文献+

南堡35-2-A6mh井复杂套铣工艺探讨 被引量:6

The discussion of complex washover technology applied to NB35-2-A6mh well
下载PDF
导出
摘要 南堡35-2-A6mh井设计为一口多底水平分支井,下主支完成后,通过下入膨胀管,斜向器进行开窗侧钻上主支作业,并在上主支下入Ф177.8 mm尾管,然后套铣尾管及斜向器沟通上、下主支。介绍了NB35-2-A6mh井套铣尾管及斜向器的作业难点及现场施工作业中遇到的问题,探讨了该井未套铣成功的原因,并提出几点保证套铣作业顺利进行的建议,为以后海上4级完井作业中套铣尾管及斜向器提供借鉴和参考。 NB35- 2- A6mh well is a multilateral well. Run in expandable tubular and whipstock to drill the up-lateral and run in theφ177.8 mm liner after the completion of the down-lateral, then washover the liner and the whipstock to connect the up-lateral and the down-lateral. In this thesis, the complexity and the field operation's problems of the washover liner and the whipstock are introduced, the reason of the unsuccessful washover is discussed, and some suggestions to assure washover are made. All of these can offer a reference for washover liner and whipstock in the TAML-Level 4 completion.
出处 《海洋石油》 CAS 2010年第1期101-104,共4页 Offshore Oil
关键词 多底井 套铣 斜向器 钻井参数 multilateral well washover whipstock drilling parameter
  • 相关文献

参考文献3

二级参考文献13

共引文献32

同被引文献37

引证文献6

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部