摘要
在岩溶地区修建隧道面临诸多风险。在铜锣山隧道建设中,通过风险辨识、风险估计、风险评价和风险控制等风险管理策略的实施,确保了隧道建设的顺利进行。
Tunnel construction has many risks in karst areas. During the construction of Tongluoshan Tunnel, risk management strategies such as risk identification, risk estimation, risk evaluation and risk control have been carried out to ensure the successful implementation of tunnel construction.
出处
《路基工程》
2010年第2期49-51,共3页
Subgrade Engineering
基金
四川省交通厅科学技术研究项目(05009)
关键词
隧道
施工
风险管理
tunnel
construction
risk management