期刊文献+

京沪高速铁路桩端注浆群桩基础沉降计算研究 被引量:1

Study on Settlement Calculation of Pile Group Base by Pile Tip Grouting in Beijing-Shanghai High-speed Railway
下载PDF
导出
摘要 大型工程建筑对基础沉降量控制的要求非常高,进行桩端注浆是减小群桩基础沉降量的有效方法,并在国内外得到了广泛应用。文中结合现场试验,提出了利用注浆后单桩静载试验结果反求土的参数,而后运用剪切变形传递法计算注浆后群桩基础的沉降量这一方法,结合现行规范进行了验证。 Large-scale engineering construction has higher requirement for base settlement control. Pile tip grouting is an effective measure to reduce pile group base settlement, and has been widely applied at home and abroad. Combined with site test, this paper puts forward the method to seek for soil parameters in reverse with the result of single pile static load test after grouting and then calculate pile group base settlement after grouting with shearing deformation transfer method, and verifies it combined with the current criterion.
出处 《路基工程》 2010年第2期51-53,共3页 Subgrade Engineering
基金 铁道部科技研究开发计划重大课题(2008G032-3)
关键词 桩端注浆 群桩基础 沉降计算 pile tip grouting pile group base settlement calculation
  • 相关文献

参考文献3

二级参考文献5

共引文献45

同被引文献9

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部