摘要 构建了一维河道洪水模型,基于历史洪水率定的河道糙率,模拟了发生设计标准洪水时河道中洪水演进过程,并采用不同方法推求的水面线校核了模拟结果的合理性,分析模拟了水位与确保水位及堤高数量关系,讨论了滩地糙率对洪水位的影响。实例结果表明,石佛寺水库下游河道个别断面堤不能满足设计标准洪水的过流要求,需进行堤防加高处理,滩地糙率对河道行洪水位影响较大。 On the basis of historical flood calibrated river roughness, one-dimensional river flood model is established for simulating the flood routing when design flood occurred. The rationality of simulation result is checked with the surface profile calculated by different methods. By analyzing the quantitative relationships between simulation water level and guaranteed water level and levee height, it discusses the impact of shoal roughness on the flood level. The results show that parts of cross section levees in downstream of the Shifosi Reservoir do not attain the design standard flood and shoal roughness has a great impact on flood water level, which need for maintenance and reinforcement.
出处 《水电能源科学》 北大核心 2010年第4期43-45,85,共4页 Water Resources and Power
基金 国家自然科学基金资助项目(50679012) 辽宁省水利科技指导性计划基金资助项目
关键词 变化条件 河道堤防 防洪能力 MIKE11 复核分析 changed condition river embankment flood control capacity MIKE 11 rechecking analysis
  • 相关文献

参考文献6

  • 1水利部水利水电规划设计总院.堤防工程设计规范(GB50286-98)[S].北京:中国计划出版社,1998.
  • 2水利部东北勘测设计研究院.辽河流域防洪规划报告[R].长春:水利部东北勘测设计研究院,2004.
  • 3王宝全.辽河干流河道整治问题的探讨[J].东北水利水电,2003,21(10):40-41. 被引量:1
  • 4Danish Hydraulic Institute (DHI). MIKE 11: A Modeling System for Rivers and Channels Reference Manual[R]. Denmark : DHI, 2005.
  • 5辽宁省石佛寺水库工程建设管理局.辽河石佛寺水库枢纽一期工程2007年度汛方案[R].沈阳:辽宁省石佛寺水库工程建设管理局,2007.
  • 6辽宁省水文总站.辽河流域水文资料(第二册)[z].沈阳:辽宁省水文总站,2004.

共引文献3

同被引文献81

引证文献11

二级引证文献57

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部