摘要 水平定向钻穿越方案的设计,目前多依靠施工队伍的经验来完成,缺乏必要的理论依据。文章从入土点选取与曲线结构优化两个方面对比分析了垂直平面法、斜平面法和动态规划法三种水平定向钻穿越方案的设计方法,修正了现行的垂直平面法。分析表明,入土点应根据钻机场地要求与地质条件进行选取;垂直平面法最具实际应用价值,并解决了现行方法所得曲线不光滑问题;扩孔比是方案设计的一项重要参数,与穿越管道的管径、长度以及施工队伍的水平有定性关系。 At present,the scheme design of pipeline crossing,as the first step of horizontal directional drilling(HDD) construction,depends mostly on the experience of contractor and is lack of necessary theories.For this issue,the paper presents a comparison of three design methods including vertical plane,oblique plane and dynamic programming in two aspects of drilling entrance selection and bore-path profile optimization,and revises the present vertical plane method.The analysis shows that the drilling entrance point should be determined according to rig site requirement and geologic condition;the method of vertical plane is the most reasonable one for field construction;the problem of unsmooth bore-path profile resulting from the present vertial plane method is solved;the reaming ratio is an important parameter in the scheme design which has a qualitative relationship with pipe diameter,crossing length and skill level of contractor.
出处 《石油工程建设》 2010年第2期1-4,共4页 Petroleum Engineering Construction
关键词 水平定向钻 穿越方案 垂直平面法 斜平面法 动态规划法 horizontal directional drilling crossing scheme vertical plane method oblique plane method dynamic programming method
  • 相关文献

参考文献9

二级参考文献17

  • 1朱波,吕建峰,张永高.管道水平定向钻穿越技术的特征分析[J].油气储运,2005,24(3):51-54. 被引量:11
  • 2John E.Richard,孙丽华.水平定向钻管道穿越的设计[J].油气储运,1996,15(12):57-60. 被引量:2
  • 3闫相祯,丁鹏,杨秀娟,张建,刘锦昆.长距离复杂地层水平定向钻穿越管道施工技术[J].油气储运,2007,26(2):55-58. 被引量:33
  • 4李山 朱文鉴 等.水平定向钻进管线铺设工程技术规范[S].中国非开挖技术协会,2002..
  • 5Kok M V, Batmaz T, Gucuyener I H. Rheological behavior of bentonite suspensions[J]. Petroleum Science and Technology, 2000,18(5/6) :519-536.
  • 6Forrestal M J,Luk V K. Dynamic spherical cavity-expansion in a compressible elastic-plastic solid [J]. Journal of Applied Mechanics, 1988,55(6) :275-279.
  • 7Forrestal M J,Tzou D Y. A spherical cavity-expansion penetration model for concrete targets[J]. Int. J. Solids and Structures, 1997,34(32):4127-4146.
  • 8Lueke J S, Ariaratnam S T. Surface heave mechanisms in horizontal directional drilling[J]. Journal of Construction Engineer ing and Management, 2005, 131(5) :540-547.
  • 9Staheli K,Bennett D. Post-construction investigation of horizontal directional drilling [C]//Anderson S D. Construction Congress V:Managing Engineered Construction in Expanding Global Markets. Minnesota: ASCE, 1997: 374-381.
  • 10Polak M A,Lasheen A. Mechanical modelling for pipes in horizontal directional drilling [J]. Tunnelling and Underground Space Technology,2001,16(1) :47-55.

共引文献99

同被引文献78

引证文献15

二级引证文献62

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部