摘要
郑西铁路客运专线CRTSⅡ双块式无砟轨道施工中,采用旭普林机械和轨排两种作业方法。通过对两种施工方法的总结和比较,阐述了各自特点和在不同施工作业环境下的适用性,简要说明了施工过程中技术改进措施,提出今后同类施工组织和技术管理方面的建议。
In CRTS Ⅱ double-block type ballastless track construction of Zhengzhou to Xi'an passenger special line,the paper adopts Züblin mechanism method and rail arrangement method,illustrates the adoptability of their respective construction environments by summing up and comparing the two construction methods,indicates the technological improvement measures in the construction process,and points out some suggestions for similar construction organization and technology management.
出处
《山西建筑》
2010年第12期283-284,共2页
Shanxi Architecture
关键词
客运专线
无砟轨道
作业方法
对比
passenger special line
ballastless track
working methods
comparison