通过对核电站全厂辅助车间PLC控制系统网络技术方案和可行性进行研究,为以后的新建电厂设计和老厂改造提供参考。
Through the research on the technical scheme and feasibility of PLC control system network of the nuclear power station, whole plant auxiliary shop, the reference was provided for new construction power plant design and the reformation of old plant hereafter.
出处
《湖北电力》
2010年第2期28-29,共2页
Hubei Electric Power
关键词
核电站
辅控网
可行性
nuclear power station
auxiliary control network