沉降地基灌注桩施工的常见问题及处理

The Common Problems and Countermeasures of Settlement Foundation Filling Pile Construction
下载PDF
导出
摘要 简要介绍了在沉降地基上进行灌注桩施工时经常发生的塌孔、桩孔倾斜、断孔和钢筋笼无法下方和上浮的情况,并就如何解决上述情况提出了具体措施。本文就在沉降地基中进行灌注桩施工时遇到的常见问题进行探讨。 The situation of hole collapse, pouring pile, broken hole, steel reinforcement cage unable to flow during filling pile construction are introduced and the specific measures are put forward according to the situation and the common problems in the Filling Pile Construction are discussed.
作者 余景超
出处 《价值工程》 2010年第3期219-220,共2页 Value Engineering
关键词 沉降地基 灌注桩 问题 处理 settlement foundation tilling pile problems handling
  • 相关文献

参考文献3

二级参考文献10

  • 1Austen J R, Franke S J, Liu C H. Ionospheric imaging using computerized tomography[J].Radio Science,1988,23(3):299-307.
  • 2Kunitsyn V E, Andreeva E S, Razinkov O G. Possibilities of the near space environment radio tomography[J].Radio Science, 1997, 32(5): 1953-1963.
  • 3Hajj G A, Romans L J. Ionospheric electron density profiles obtained with the global positioning system: results from the GPS/MET experiment[J].Radio Science,1998,33(1):175-190.
  • 4Leitinger R, Ladreiter H P, Kirchengast G. Ionosphere tomography with data from satellite reception of global navigation satellite system signals and ground reception of navy navigation satellite system signals[J].Radio Science,1997,32(4):1657-1669.
  • 5Schreiner W S, Sokolovskiy S V. Analysis and validation of GPS/MET radio occultation data in the ionosphere[J].Radio Science,1999,34(4):949-966.
  • 6Yeh K C, Raymund T D. Limitations of ionospheric imaging by tomography[J].Radio Science,1991,26(6):1361-1380.
  • 7周贤高.人工挖孔桩的施工安全[J].民营科技,2008(2):148-148. 被引量:1
  • 8曹新云.人工挖孔桩穿过含水砂层施工技术[J].科技信息,2008(7):105-105. 被引量:3
  • 9沈保汉.第一讲 桩基础施工技术现状及发展方向[J].施工技术,2000,29(5):43-45. 被引量:27
  • 10徐继生,邹玉华.时变三维电离层层析成像重建公式[J].地球物理学报,2003,46(4):438-445. 被引量:16

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部