简要介绍了在沉降地基上进行灌注桩施工时经常发生的塌孔、桩孔倾斜、断孔和钢筋笼无法下方和上浮的情况,并就如何解决上述情况提出了具体措施。本文就在沉降地基中进行灌注桩施工时遇到的常见问题进行探讨。
The situation of hole collapse, pouring pile, broken hole, steel reinforcement cage unable to flow during filling pile construction are introduced and the specific measures are put forward according to the situation and the common problems in the Filling Pile Construction are discussed.
出处
《价值工程》
2010年第3期219-220,共2页
Value Engineering
关键词
沉降地基
灌注桩
问题
处理
settlement foundation
tilling pile
problems
handling