摘要 阐述了内桥接线方式的110 kV变电所的不同运行方式,以及备自投装置动作逻辑。同时对变换运行方式后不同故障下的备自投动作情况进行了分析。针对110 kVⅡ段母线故障时,可能引起设备的受损程度加重扩大事故,提出了通过合理的系统方式及备自投方式调整的方案,并通过对调整后各类故障时对电网影响进行分析,证明改进后的方案不仅可以避免重复向故障点送电故障扩大的危险,也可以最大可能地保证供电的可靠性。 The different operation mode in 110 kV inner-bridge-connection substation and the operating logic of the automatic switching-on device of reserve power source are discussed. Meanwhile, the device operating process under different failures is analyzed after changing the operation mode. When the failure happens in 110 kV Ⅱ main bus, it will be expanded and thus bring more damage to the equipments. So, reasonable system mode and the promoted project on the switch-on device are put forward. By analyzing the device operating process under the failures, the promoted project is proved to be satisfied and the failure is avoided to be expanded.
出处 《电力系统保护与控制》 EI CSCD 北大核心 2010年第9期134-135,150,共3页 Power System Protection and Control
关键词 内桥接线 备用电源 运行方式 inner bridge connection: reserve power: operation mode
  • 相关文献

参考文献4

  • 1DL/T969-2005,变电站运行导则[s].
  • 2承文新,等.静态备用电源自动投入装置技术条件,DL/T526-2002[M].北京:中国电力出版社,2002.
  • 3谢尚德,贾沛义,等.35-110kV无人值班变电所设计规程,DL/T5103-1999[M].北京:中国电力出版社出版,1999.
  • 4张友,左长春,等.电力系统安全自动装置设计技术规定,DL/T5147-2001[M].北京:中国电力出版社出版,2001.

同被引文献28

引证文献9

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部