《铁路工程施工组织设计指南》中工期参考指标的确定 被引量:7

Determination of reference indexes of construction period in guide of construction organization design in railway engineering
下载PDF
导出
摘要 确定工期指标是铁路施工组织设计的重要内容。此文结合铁路工程的特点,将现场工期资料分析法与标准工序推导法结合起来,对《铁路工程施工组织设计指南》工期参考指标的确定方法进行介绍和探讨,在此基础上重点对路基、桥梁、隧道等单项工程工期指标的确定作出较为详细的说明。 That the determination of reference indexes of construction period is an important contents of construction organization design in railway engineering. This paper, combining with characteristics of railway engineering, on the bases of a combination between material analysis method and deduction method, makes an introduction and exploration of determination methods of reference indexes of construction period. On this basis, this paper makes a more detailed introduction into determination methods of construction period of single project such as subgrades, bridges and tunnels, etc.
作者 郭晋恒
出处 《铁路工程造价管理》 2010年第3期11-14,共4页 Railway Engineering Cost Management
关键词 铁路工程 施工组织 工期 指标 railway engineering constructional organization construction period indexes
  • 相关文献

参考文献4

共引文献10

同被引文献49

引证文献7

二级引证文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部