摘要
分析开展废水处理设施环保验收监测时存在的问题,探索分接到建设项目的核准试生产报告后、正式组织验收监测时、发验收监测报告前三个阶段对废水处理设施进行监测,提高建设项目"环境保护"竣工验收监测工作的可靠性。
The problems of wastewater treatment facilities appear in acceptance check of environmental protection were analyzed. The monitor was divided into three stages, which were the proposed construction project received the approval of sub-trial production , the formal monitor acceptance, and at the acceptance monitoring report issued before wastewater treatment facilities to monitor the proposal, were disccused to enhance the reliability of acceptance monitoring project about environmental protection.
出处
《三峡环境与生态》
2010年第3期60-62,共3页
Environment and Ecology in the Three Gorges
关键词
废水
验收监测
分期
wastewater
acceptance monitoring
stages