摘要
随着我国公路和铁路建设的不断发展,长大隧道越来越多,施工难度也越来越大。作为隧道施工配电、通风系统,应根据隧道施工的难度和隧道实际情况采取合理的布设方案,为顺利施工创造良好环境。结合麦积山隧道施工实例,详细介绍了施工过程中通风和配电方面的措施。
With constant development of highway and railway construction in our country, the number of extra-long tunnels is increasing, together with the increase of construction difficulty. The power distribution and ventilation system in tunnel construction should adopt reasonable layout scheme according to tunnel construction difficulty and real tunnel conditions, so as to create a good environment for smooth construction. In light of tunnel construction practice in Maiji Mount. , this paper introduces in detail the ventilation and power distribution measures in construction.
出处
《铁道建筑技术》
2010年第5期45-48,共4页
Railway Construction Technology
关键词
特长隧道
施工配电
隧道通风
extra-long tunnel
power distribution
tunnel ventilation