3Ebank W J. Flow unit concept-integrated approach to resetvoir description for engineering projects[J]. AAPG bulletin,1987,71(5):551-552.
4Guangming Ti. Use of flow units as a tool for reservoir desorlption: a case study[J]. SPE Formation Evaluation, 1995,10(2) : 122-128.
5William E Galloway. Genetic stratigraphic sequences in basin analysis I : architecture and genesis of flooding surface bounded depositional units. AAPG, 1989, 73(2) :125 - 142.
6Hearn C L,Ebanks W J Jr,Tye R Set al. Geological factors influencing reservoir performance of the Hartzog Draw Field,Wgoming. JPT,1984,36(9) :1334 - 1335.
7Ebanks W J Jr. Flow unit concept - integrated approach to reservoir description for engineering projects. AAPG,1987,71 (5) :551 -552.
6YIN TaiJu1,ZHANG ChangMin1,ZHANG ShangFeng1,WANG ShouPing2 & MAO LiHua2 1 Key Laboratory of Exploration Technologies for Oil and Gas Resources,Ministry of Education,Yangtze University,Jingzhou 434023,China,2 Zhongyuan Oilfield of China Petroleum & Chemical Corporation,Puyang 457001,China.Estimation of reservoir and remaining oil prediction based on flow unit analysis[J].Science China Earth Sciences,2009,52(S1):120-127. 被引量:4