摘要
随着钢结构工程施工技术的不断发展,钢结构工程的吊装技术也得到了不断进步,其中液压整体提升施工技术以效率高、工期短、成本低而得到了广泛应用。介绍北辰区行政许可服务中心及档案馆钢连廊液压整体提升施工技术。
The lifting technology of steel structures has been inproved continuously with the development of the construction technology of the steel structures. The hydraulic integral-lifting technology has been widely used due to its high efficiency, shorter period of construction, and low cost. It was presented the hydraulic integral-lifting technology of constructing the project of Beichen Borough Service Center and the steel corridor for the archive office.
出处
《钢结构》
2010年第6期67-71,共5页
Steel Construction
关键词
钢桁架
整体提升
同步控制
steel truss
integral hoisting
synchronous control