给水泵试运行中的问题及解决措施

BFP Problems and Countermeasures during Commissioning
下载PDF
导出
摘要 对外承建的国产300 MW机组,通常配备3台50%容量的电泵,或配备2台50%容量的汽泵及1台30%容量的电泵。给水泵的正常运行,对机组的正常运行至关重要。在电厂机组试运中,对给水泵出现的几种故障现象进行了分析,对油温、水温及液力耦合器油位等问题进行了分析并提出解决措施。 There are three motor-driven Boiler Feed Pumps(BFP) in 50% capacity or two steam-driven BFPs in 50% capacity and one motor-driven BFP in 30% capacity equipped with one 300MW power unit currently. Running without problem of BFP is very important for the whole unit. In this article, some problems occurred in BFP have been analyzed and countermeasures have been put forward to solve the problems such as high oil temperature and water temperature and the oil level of the hydraulic coupling, etc. during the commissioning.
作者 马勇
出处 《电站辅机》 2010年第2期25-28,共4页 Power Station Auxiliary Equipment
关键词 给水泵 机械密封液 机组 轴承 温度 液力耦合器 boiler feed pump mechanical sealing liquid power unit bearing temperature hydraulic coupling
  • 相关文献

参考文献4

  • 1沈阳水泵厂.印度SAGARDIGHI电厂2×300MW机组给水泵CHTC5/6技术文件[R].2006.
  • 2印度SAGARDIGHI电厂.汽轮机运行规程说明书[R].印度SAGARDIGHI电厂,Sagardighi.West Bengal.India,2007.
  • 3西北电力设计院.印度SAGARDIGHI电厂给水泵系统设计流程图[R].2005.
  • 4西北电力设计院.印度SAGARDIGHI电厂给水管道安装图[R].2005.