摘要
该文主要介绍对柬埔寨斯登沃代一级水电站工程消能方案试验研究情况,通过对原方案反复试验验证和修改后,提出的"宽尾墩+跌坎式消力池+水跃坎"联合消能工,很好地解决了工程的消能防冲难题,节省了工程量,已被工程设计采纳。
This text introduce the process of experimental staudy on hydraulic model in Cambodia stung atay first hydroelectric station,Through repetitive experimental rvision of original design,a better joint energy dissipater scheme of flaring gate pier and plunge pool and hydraulic jump bucket can solove the problem of energy dissipation and erosion control,this scheme economize the project amount and adopted by the station.