摘要
以太湖流域9座采用SBR及其改进工艺的污水处理厂升级改造工程为例,介绍了该工艺升级改造方案的选择和达标难度分析,并在案例分析的基础上,总结了SBR类污水处理厂改造工程在设计和运行时需要注意的问题。
The upgrading reconstruction project of nine SBR wastewater treatment plants in Taihu Lake Basin were introduced,and the process selection of these projects and reaching standard difficulty analysis were analyzed.Base on the projects analysis,some key problems of design and operation were pointed out for the upgrading reconstruction of SBR wastewater treatment plant.