摘要
本文介绍了三峡一期围堰运行三年后的工程实况调查与试验研究成果,这些成果为三峡二期围堰的设计、施工和安全可靠性分析进一步提供了数据,同时也对其它类似工程有一定的参考价值。
The existing state and research outcomes of the 1st stage of cofferdam
engineering in the three gorges after a construction period of three years are presented. All those
outcomes provide further information for the design, construction and safety reliability analysis of
the 2nd stage of cofferdam engineering and they may also be used as reference for other similar
projects.
出处
《工程勘察》
CSCD
北大核心
1999年第3期19-22,共4页
Geotechnical Investigation & Surveying
关键词
围堰
淤砂
防渗墙
三峡工程
cofferdam\ silt\ leakproof wall\ the three gorges