提出了"二牵六"大截面导线架线施工技术,并在向家坝—上海±800 kV特高压直流输电线路工程皖3A标段成功应用,解决了900 mm2、1 000 mm2大截面多分裂导线的架线施工难题。
A two-drag-six stringing construction technology for large cross-section conductors was developed and successfully applied in the Anhui 3A section of Xiangjiaba-Shanghai ± 800 kV UHVDC project,which has solved the problem of stringing multi-bundle large cross-section conductors of 900 mm^2 and 1 000 mm^2.
出处
《电力建设》
2010年第8期43-45,共3页
Electric Power Construction
关键词
±800kV特高压直流
架线施工技术
二牵六
大截面导线
组合走板
无线监控
± 800 kV UHVDC project
stringing construction technology
two-drag-six
large-sectiond conductors
assembly working boowd