摘要
介绍了采用夹点技术进行换热网络的最优综合的三个步骤,即预分析、形成初始网络和调优。
Three steps as pre-analysis,forming primary net and modifying the net for optimizing the heat exchanger net by pinch point technology were introduced. An optimum or almost optimum heat exchanger net can be obtained by this way.
出处
《化学工业与工程技术》
CAS
1999年第2期4-7,共4页
Journal of Chemical Industry & Engineering
基金
国家自然科学基金