5Johns A T, Eng C, A1 Rawi A M. Digital Simulation of EHV Systems Under Secondary Arcing Conditions Associated with Single-pole Autoreclosure. IEE Proceedings —Generation, Transmission and Distribution, 1982, 129(2) : 49-58.
6Aggarwal R K, Johns A T, Song Y H, et al. Neural network Based Adaptive Single-pole Autoreclosure Technique for EHV Transmission Systems. lEE Proceedings —Generation, Transmission and Distribution, 1994, 141(2): 155-160.
7Zoric K J, Djuric M B, Terzija V V. Arcing Faults Detection on Overhead Lines from the Voltage Signals. Electrical Power Energy Systems, 1997, 19(5): 299-303.
8Li Bin, Li Yongli, Zeng Zhian, et al. A Novel Numerical Algorithm for Single pole Adaptive Reclosure. In: Proceedings Power System Technology, Vol4. Kunming: 2002. 2612-2616.
9亚力山大罗夫.超高压送电线路的设计[M].北京:水利电力出版社,1987.
10Ge Yaozhong,Sui Fenghai,Xiao Yuan.Prediction methods for preventing single-phase reclosing on permanent fault[J].IEEE Trans on Power Delivery,1989,4(1):114-121.