期刊文献+

防控工程建设领域职务犯罪方法探析

Exploration of the Methods of Preventing and Controlling Duty Crimes in the Field of Engineering Construction
下载PDF
导出
摘要 针对政府在工程全生命期各阶段审批、监管环节,应用全生命期管理理论和PDCA循环原理,从主动控制和被动控制两个层面提出构建全生命期动态防控工程建设领域腐败及职务犯罪的方法体系。 According to the stages of approval,supervision in the whole life cycle of engineering that the Government takes part in,this paper applies principles of whole life cycle and PDCA cycle,and,from the aspects of active control and passive control,proposes a method system to dynamically prevent and control corruption and duty crimes during the whole life cycle of engineering construction.
作者 马振东
出处 《广东工业大学学报(社会科学版)》 2010年第4期52-55,66,共5页 Journal of Guangdong University of Technology(Social Sciences Edition)
关键词 建设工程 全生命期管理 动态控制 后评价 职务犯罪 防控犯罪方法 construction project whole life cycle management dynamic control post-evaluation duty crime method of preventing and controlling duty crime
  • 相关文献

参考文献8

  • 1郝明金.通报专项治理工作进展情况和查处的20起典型案件[OL].[2010-05-21].http:∥www.mos.gov.cn/Template/article/display0.jsp?mid=20100420032893.
  • 2项目管理协会.项目管理知识体系指南[M].卢有杰,王勇,译.北京:电子工业出版社,2005.
  • 3成虎,工程管理概论[M].北京:中国建筑工业出版社,2007.
  • 4马振东.建设项目后评价指标体系框架构想[J].建筑经济,2006,27(11):25-28. 被引量:20
  • 5倪星.治理工程建设领域突出问题论坛专辑[C].广州:广东省人民检察院,2009.33.
  • 6郑红,等.广东省重点建设项目预防职务犯罪工作指引[R],广州:广东省人民检察院,2009.10.
  • 7《国务院关于投资体制改革的决定》(国发[2004]20号),2004.7.
  • 8中共中央办公厅、国务院办公厅《关于开展工程建设领域突出问题专项治理工作的意见》,2009.7.

二级参考文献2

  • 1国务院国有资产监督管理委员会.中央企业固定资产投资项目后评价工作指南.国资发规划[2005]92号.
  • 2水利部水利建设与管理总站等.水利工程建设项目后评价报告编制规程(征求意见稿).[M]北京:中国水利水电出版社.2003.

共引文献73

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部