摘要
分析了上青矿在正掘施工采区斜坡道过程中遇到的实际困难,根据现有施工条件因地制宜采取了有效措施,从而最大限度地降低了工程成本并减轻了管理负担,为今后斜坡道的施工提供了借鉴。
The difficulties in ramp driving in Shangqing Mine are analyzed.According to actual conditions for ramp driving,effective measures are taken that reduce farthest the driving cost and the load of management work.The experiences are referential for ramp driving in the future.
出处
《矿业工程》
CAS
2010年第5期28-29,共2页
Mining Engineering
关键词
斜坡道正掘
方案改进
指标对比
ramp driving
improvement of scheme
comparison between indexes