摘要
常规甩负荷试验方法是新建机组上网运行的必备条件。对甩负荷试验前需要具备的条件、甩负荷试验方法、预期目标、试验中经常遇到的问题及其处理措施等进行了较系统地探讨。
The conventional load-rejection test method is a necessary condition for newly constructed units to put them into operation for connecting them onto the power grid,a systematic approach to the necessary conditions before load-rejection test,the method of load-rejection test,and its anticipated objectives,as well as the problems frequently encountered in the test,and their solving methods,has been carried out.
出处
《热力发电》
CAS
北大核心
2010年第9期57-60,共4页
Thermal Power Generation
关键词
汽轮发电机组
甩负荷
常规法
测功法
转速
调节系统
turbo-generator set
load-rejection
power-scaling method
revolution speed
regulating system