摘要
介绍了第10次黄河调水调沙所取得的初步效果,回顾了洪水期间洪峰流量增值、荥阳市黄河滩区群众被水围困、花园口浮桥舟体撞击公铁两用桥栈桥等问题。建议做好以下几项工作:①尽快开展洪峰流量增值的研究;②优化水库群联合调度,努力实现水库与河道减淤;③开展黄河知识宣传,提高全民防汛减灾认识;④强化防汛责任,加强黄河河道与滩区管理;⑤跟踪分析洪水沿程表现,进一步提高洪水测报水平等。
The paper introduces the preliminary effect achieved by the 10th regulated discharge regime of the Yellow River and reviews the issues of the increment of peak discharge during floods,the people living in the floodplain of Xingyang City were surrounded by the flood water and the trestle of highway-railway bridge was impacted by the boats of floating bridge at Huayuankou.It suggests doing better work of the following: a) carrying out the study on the increment of peak discharge promptly;b) optimizing joint operation of reservoirs and striving for the achievement of sediment reduction of reservoirs and river channel;c) launching the publicity of the Yellow River knowledge and increasing the understanding on flood control and natural disaster reduction of the whole nation;d) strengthening the duty of flood control and the management of the river channel and floodplain and;e) tracking and analyzing the performance of floods along the course and further increasing the level of flood forecasting.
出处
《人民黄河》
CAS
北大核心
2010年第9期1-2,5,共3页
Yellow River
关键词
调水调沙
洪峰增值
水沙调度
滩区管理
黄河
regulated discharge regime
increment of peak discharge
silt-discharge regulation
floodplain management
the Yellow River