摘要 文章采用工作研究的方法对某公司平板机组生产线进行分析,通过程序分析、人机分析、动作分析,运用5W1H方法及ECRS(取消、合并、重排、简化)原则,找出生产线上存在的问题并给出改善方法。运用时间测定及模特法计算合理的作业时间;通过分析改善,减少了生产线生产工序、工人等待时间及操作动作,提高了生产线平衡率。 The methods of work study are applied to analyze flat-panel units' production line for a certain company.Using the 5W1H check list and ECRS(elimination,combination,rearrangement,simplicity) principles,the existing problems in the production line are found and the improving method is put forward through procedure analysis,man-machine analysis and motion analysis.Using time measurement and MOD method,the reasonable work time is calculated.Through above analysis and improvement on the production line,the production process,the latency time and the motions of workers operation are reduced,and the balance rate of production line is improved.
作者 王雁
出处 《合肥工业大学学报(自然科学版)》 CAS CSCD 北大核心 2010年第9期1295-1298,1303,共5页 Journal of Hefei University of Technology:Natural Science
基金 合肥工业大学科学研究发展基金资助项目(2009HGXJ0092)
关键词 程序分析 人机分析 动作分析 时间研究 procedure analysis man-machine analysis motion analysis time research
  • 相关文献

参考文献8

二级参考文献18

  • 1吴杰明.应用FOG方法提高生产线平衡率浅析[J].上海电力学院学报,2004,20(2):49-53. 被引量:12
  • 2孙建华,高广章,蒋志强,施进发.程序分析法在产线平衡中的应用[J].机械设计与制造,2005(5):148-150. 被引量:18
  • 3范中志 等.基础工业工程[M].机械工业出版社,1994..
  • 4王应洛.工业工程[M].北京:机械工业出版社,19914..
  • 5[3]周密.IE方法实战精解[M].广州:广东经济出版社,2002.
  • 6Harrington HJ. Business Process improvement [M]. New York: McGraw-Hill, Inc., 1991.
  • 7Drury C G. Change and Measurement in Applied Ergonomics [ J ].Human Factors and Ergonomics in Manufacturing, 1997, 7 (4):253 -267.
  • 8Salvendy G. Handbook of Human Factors and Ergonomics [ M ].New York: John Wiley&Sons, Inc, 1997. 1865-1925.
  • 9Hendrick H W. Ergonomics: An International Perspective [ M ].CRC Press, 1999.
  • 10范中志,张树武,孙义敏.基础工业工程[M].北京:机械工业出版社,1994:53-55,213-220.

共引文献263

同被引文献25

  • 1朱夏芳,孔庆华.汽车轮胎硫化工序中轮胎取放的人机操作分析和改进[J].精密制造与自动化,2007(2):23-24. 被引量:3
  • 2Jose Fernando Goncal Ves,Jorge Raimundo. A hybrid genetic algorithm approach to mixed-model assembly line balancing[ J ]. Jounral of Heuristics ,2002 ( 18 ).
  • 3Jin Mingzhou, Wu S David. A new heuristic method for mixed model assembly line balancing problem [ J ]. Computers and Industrial Engineering,2003,44( 1 ).
  • 4Vilarinho P M,Simaria A S. An ant colony optimization algorithm for balancing mixed-model assembly lines with parallel work stations [ J]. International Journal of Production Researeh, 2006,44 ( 2 ).
  • 5Akpnar Senerl, Mirac Bayhan G. A hybrid genetic 'algorithm for mixed model assembly line balancing problem with Parallel workstations and zoning constraints [ J ]. Engineering Applications of Artificial Intelligence ,2010,24( 3 ).
  • 6刘嘉亮.V公司生产线平衡优化研究[D].广州:华南理工大学,2011.
  • 7陈荣秋,马士华.生产线运作管理[M].3版.北京:机械工业出版社,2011.
  • 8朱术名.基于仿真技术的汽车装配生产系统平衡性研究[D].上海:上海交通大学,2012.
  • 9易树平;郭伏.基础工业工程[M]北京:机械工业出版社,2008.
  • 10余冠洲.用操作分析法优化数控加工培训流程[J].广东工业大学学报(社会科学版),2008,8(B07):234-236. 被引量:1

引证文献4

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部