摘要
通过对地基进行沉降计算,对基础沉降进行实际观测,将计算数值与观测数值进行对比分忻.结果表明:施工降水是导致邻近建筑物沉降、开裂的原因;邻近建筑物地基沉降的规律是离施工降水现场由近至远逐渐减小;采用设止水帷幕和回灌井联合控制地下水位下降是一种有效的措施.
Based on the sedimentation calculation of foundation and the practical observation of basic sedimentation ,the analyses are made of the influence of precipitation of river construction on the adjacent buildings. The result shows that the subsidence of the buildings and cracks are due to the precipitation water in the construction;the foundation settlement of adjacent buildings decreases from near region to far region of the construction site of precipitation;an effective way is to combine the water curtain with the recharge well to control the decrease of the groundwater level.
出处
《力学与实践》
CSCD
北大核心
2010年第5期41-44,共4页
Mechanics in Engineering
关键词
施工降水
有效应力
差异沉降
止水帷幕
回灌井
precipitation of construction
effective stress
differential settlement
waterproof curtain
recharge well