摘要
针对秦山和恰希玛300MW压水堆核电厂的特点,研究了改进堆芯燃料管理的策略和方法,提出了实现18个月和更长换料周期以及加深卸料燃耗以提高电厂经济性的途径。
At the base of analysing current situation and tapping potentialities,the strategy and method of improving in core fuel management is studied in accordance with the characteristics of Qinshan and Chashma 300MW PWR Nuclear Power Plant,and the way of extending the cycle length to eighteen months or more and deepening discharge burnup is presented for enhancing economic benefit of the plant.
出处
《核动力工程》
EI
CAS
CSCD
北大核心
1999年第2期97-102,共6页
Nuclear Power Engineering
关键词
核电厂
堆芯燃料管理
策略选择
循环长度
Nuclear power plant In core fuel management Strategy selection Cycle length