摘要
介绍巴江口水电站溢流坝采用宽尾墩戽式消力池联合消能的试验研究成果,试验表明:该联合消能型式能较好解决巴江口水电站的大单宽流量、低佛氏数的泄洪消能问题,减轻下游河床、岸坡的冲刷,确保船闸下游安全通航。
This paper introduced the result of research and test for UDEWSP of the Bajiangkou HS . The test proved that UDEWSP solved better the problem of energy dissipation . And so reduces the erosion of downstream bed and bank and ensures the lock shipping safely .
出处
《广西水利水电》
1999年第2期19-21,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
宽尾墩
戽式消力池
消能
水电站
联合消能
试验
wide tail pier , bucket typed stilling pool , energy dissipation effect, the Bajiangkou HS