摘要
依据我国桥梁施工技术规范、缆索吊装施工技术资料和柔性吊桥施工实践,在总结柔性吊桥施工经验的基础上,探讨柔性吊桥缆索吊装索道施工的施工方案、施工准备、施工工艺、施工方法和施工控制,系统提出柔性吊桥缆索吊装施工过程的关键技术,为山区和景区等复杂地形条件下柔性吊桥施工提供科学依据。
According to construction technical manual of bridge, construction technical documentation of cable hoisting and construction practice of flexible suspension bridge, construction scheme, construction preparation, construction technology, construction method and construction control were discussed based on construction experience of flexible suspension bridge were" dealt with. Key techniques of construction process for cable hoisting of flexible suspension bridge were presented systematacially. These key techniques provide scientific evidence for construction of flexible suspension bridge in complicated orographic condition at mountainous area and scenic area.
出处
《福建林学院学报》
CSCD
北大核心
2010年第4期375-379,共5页
Journal of Fujian College of Forestry
基金
国家自然科学基金资助项目(30972359)
福建省自然科学基金资助项目(S0750003)
福建省本科<工程索道>精品课程资助项目(闽教高[2007]45号)
关键词
柔性吊桥
缆索吊装
施工技术
flexible suspension bridge
cable hoisting
construction technique