模拟宝钢3号高炉冷却壁的实际工作条件,建立了国内第一台大型冷却壁热态试验炉。通过测量进水温度、进水速度、炉气温度及热冲击等条件对光面冷却壁热面温度的影响,分析了宝钢3号高炉带凸台冷却壁损坏的主要原因。
Simulating the operation conditions of staves of No3 BF at Baosteel,the first experimental furnace in China for hot test of large stave has been establishedThe influence of temperature and velocity of inlet water,gas temperature of BF and heat impact on the temperature distribution of the stave have been studiedThe main cause of stave damage is discussed