摘要 地铁隧道建设过程中主要通过地表沉降监测反映盾构施工的安全状态,Peck公式一直被认为是最简单实用的隧道施工期地表沉降计算方法,因此针对其适用性和参数取值问题是人们研究的重点。文中结合盾构施工的特点,探讨盾构施工中引起地层扰动的主要因素,通过在建地铁隧道的实测地表沉降数据分析Peck公式的适用性和参数取值问题,并探讨了几种特殊情况下的地表沉降规律,以指导施工方案的调整,减小施工的环境影响,同时保证隧道自身的施工质量。 The environmental safety status is mostly reflected by the monitoring of surface settlement during the construction of Metro tunnel.Peck's equation has been always regarded as the most simple and practical calculation method of surface settlement during construction,and so its applicability and parameter sampling become the emphasis of research.Considering the characteristic of shield construction,the major factors of strata disturbance and rule of surface settlement in several especial conditions caused by shield construction are discussed,and the applicability and parameter sampling of Peck equation are analyzed by measured surface settlement in constructing Metro tunnel.The research can be used to direct the adjustment of construction project to lessen the environmental influence and ensure the quality of tunnel itself.
作者 鲁志鹏
出处 《交通科技》 2010年第5期19-22,共4页 Transportation Science & Technology
关键词 软土地区 地铁隧道 施工期 地表沉降 规律 soft clay area metro tunnel constructing period surface settlement rule
  • 相关文献

参考文献1

共引文献56

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部