期刊文献+

基于可控提前期的两供应商-单制造商协同模型 被引量:4

Two Vendor-One Buyer Coordination Model Based on Controllable Lead-time
下载PDF
导出
摘要 本文建立了一个基于BOM表关系的两供应商-单制造商供应链模型,在需求服从正态分布和给定服务水平约束条件下,决策制造商分别向两供应商的订货提前期和订货批量,使得供应链成本最优。文章通过模型分析得出所建立的模型是一个凸规划问题,存在唯一的最优解,并且给出了模型的求解算法,最后通过一个算例说明了模型和算法的有效性。 This paper research a two vendor-one buyer supply chain model based on the BOM.Under the condition that the lead-time and order quantity are both treated as variables,the system is subjected to service level constraints.It can be proved that the proposed model is a convex programming problem and there is only one optimal solution,and the solution algorithm is also given.Finally,the effectiveness of the model and the algorithm provided in this paper is validated with a numerical example.
作者 王海军 黄铮
出处 《管理工程学报》 CSSCI 北大核心 2010年第4期138-142,共5页 Journal of Industrial Engineering and Engineering Management
基金 国家自然科学基金资助项目(70972020) 华中科技大学自主创新基金资助项目(M2009054)
关键词 BOM(bill of material) 可控提前期 订货批量 服务水平约束 BOM(bill of material) controllable lead-time order quantity service level constraint
  • 相关文献

参考文献10

  • 1Ouyang LY,Wu KS,Ho CH.Integrated vendor buyer cooperativemodels with stochastic demand in controllable lead time[].International Journal of Production Economics.2004
  • 2Ben Day M,Hariga M.Integrated single vendor single buyer modelwith stochastic demand and variable lead time[].InternationalJournal of Production Economics.2004
  • 3Ouyang LY,Chen CK,Chuang HC.Quality improvement,setupcost and lead time reductions in lot size reorder point models withan imperfect production process[].Computers and Operations Research.2002
  • 4Chuang BR,Ouyang LY,Chuang KW.A note on periodic reviewinventory model with controllable setup cost and lead time[].Computers and Operations Research.2004
  • 5Pan JC,Lo MC,Hsiao YC.Optimal reorder point inventory modelwith variable lead time and backorder discount considerations[].European Journal of Operational Research.2004
  • 6Hariga M,Ben-Daya M.Some stochastic inventory models with deterministic variable lead time[].European Journal of Operational Research.1999
  • 7Liao CJ,Shyu CH.An analytical determination of lead time with normal demand[].International Journal of Operations and Production Management.1991
  • 8Ouyang L Y,Yeh N C,Wu K S.Mixture Inventory model with backorders and lost sales for variable lead time[].Journal of Operational Research Society.1996
  • 9Ilkyeong Moon,Sangjin Choi.A note on lead time and distributional assumptions in continuous review inventory models[].Computers and Operations Research.1998
  • 10L-Y Ouyang,C-K Chen,H-C Chang.Lead time and ordering cost reductions in continuous review inventory systems with partial backorders[].Journal of the Operational Research Society.1999

同被引文献56

  • 1丁利军,夏国平,葛健.两次生产和订货模式下的供应链契约式协调[J].管理科学学报,2004,7(4):24-32. 被引量:45
  • 2陈旭.需求信息更新条件下易逝品的批量订货策略[J].管理科学学报,2005,8(5):38-42. 被引量:40
  • 3杨文胜,李莉.基于Stackelberg模型的准时交货激励契约分析[J].系统工程理论与实践,2006,26(3):17-24. 被引量:12
  • 4苏平,伍乃骐,于兆勤,余强.改进遗传算法在虚拟企业伙伴选择与优化中的应用[J].系统工程理论与实践,2006,26(12):85-92. 被引量:18
  • 5AKELLAR G H. Supply managemerit in assembly systems with ran- dom yield and random demand [ J]. IIE Transactions, 2000, 32 (8): 701 -714.
  • 6GUIER M G, BILGIC T. On coordinating an assembly system under random yield and random demand [ J ]. European Journal of Opera- tional Research, 2009, 196 (1) : 342 -350.
  • 7KELLE P, TRANSCHEL S, MINNER S. Buyer- supplier coopera- tion and negotiation support with random yield consideration [ J ]. In- ternational Journal of Production Economics, 2009, 118 (1) : 152 - 159.
  • 8HEY J, ZHANG J. Random yield risk sharing in a two - level supply chain [ J ]. International Journal of Production Economics, 2008, 112 (2) : 769 -781.
  • 9GURNANI H, GERCHAK Y. Coordination in decentralized assem- bly systems with uncertain component yields [ J ]. European Journalof Operational Reareh, 2007, 176 (3) : 1559 - 1576.
  • 10黄庆扬,陈俊芳.基于可控提前期的随机寄售库存模型[J].管理工程学报,2010,24(1):138-145.

引证文献4

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部