期刊文献+

不确定因素下电子侦察卫星鲁棒性调度方法 被引量:3

A robust scheduling method of electronic reconnaissance satellites with uncertainty
原文传递
导出
摘要 针对卫星电子侦察过程中的各种不确定因素,提出了一种静态调度与反应式调度相结合的鲁棒性调度方法.静态调度中针对具有随机分布特性的侦察数据量,并考虑卫星的使用约束和任务约束,建立了机会约束混合整数规划模型;提出了基于罚函数的进化算法,用以解决模型的非线性与非凸特性,结合蒙特卡罗抽样的罚函数用以解决模型的随机性.反应式调度中针对新任务提交、资源失效和任务执行失败等离散不确定因素,提出了一种快速启发式任务插入算法,基于初始调度方案,有效降低调度复杂度.仿真实验表明该方法适用于解决不确定因素下电子侦察卫星调度问题. Aimied at the uncertainties in the course of satellites electronic reconnaissance,a robust scheduling method was proposed,by the combination of static scheduling with reactive one.In the process of static scheduling,taking the data quantity with stochastic distribution as well as satellites usage restriction and task restriction into account,a mixed integer programming model for electronic reconnaissance satellites scheduling problem(ERSSP)based on chance constrained programming was established.A penalty function based evolutionary algorithm was proposed.The evolutionary algorithm was resorted to resolve the non-linear and non-convex component in the model.And the penalty function combined with Monte Carlo simulation was to address the stochastic nature of ERSSP.In reactive scheduling,a fast heuristic tasks insertion algorithm (FHTIA)was proposed according to the dispersed uncertain factor,e.g.new tasks submission,satellites failure,reconnaissance plan execu- tion failure.On the basis of the excellent performance of the original schedule,the complexity of the reactive scheduling was reduced greatly.The simulation results show that the method could solve ERSSP under uncertainty effectively.
出处 《华中科技大学学报(自然科学版)》 EI CAS CSCD 北大核心 2010年第11期80-83,共4页 Journal of Huazhong University of Science and Technology(Natural Science Edition)
基金 国家安全重大基础研究资助项目(6136101)
关键词 卫星调度 机会约束规划 罚函数 反应式调度 启发式算法 satellite scheduling chance constrained programming penalty function reactive scheduling heuristic algorithm
  • 相关文献

参考文献10

  • 1Lin W C, Liao D Y, Liu C Y, et al. Daily imaging scheduling of an earth observation satellite[J]. IEEE Transaction on Systems, Man, and Cybernetics, Part A: System and Humans, 2005, 35(2): 213- 223.
  • 2Bianchessi N, Righini G. Planning and scheduling al gorithms for the COSMO SkyMed conslellation[J].Aerospace Science and Technology, 2008. 12 (7) :535-544.
  • 3Lee Soojeon. Task scheduling algorithm for the communication, ocean, and meteorological satellite [J].ETRI Journal, 2008, 30(1): 1 12.
  • 4王钧,李军,陈健,郭玉华,景宁.多目标EOSs联合成像调度方法[J].宇航学报,2007,28(2):354-359. 被引量:33
  • 5Gabrel V, Vanderpooten D. Enumeration and interactive selection of efficient paths in a multiple criteria graph for scheduling an earth observing satellite[J]. European Journal of Operational Research, 2002, 139: 533- 542.
  • 6徐雪仁,宫鹏,黄学智,金勇.资源卫星(可见光)遥感数据获取任务调度优化算法研究[J].遥感学报,2007,11(1):109-114. 被引量:29
  • 7Bianchessi N, Cordeau J F, Desrosiers J, et al A heuristic for the multi-satellite,multi-orbit and multiuser management of earth observation satellites[J]. European Journal of Operational Research, 2005, 177 (2) : 750-762.
  • 8Bonissone P P, Subbu R, Eklund N, et al. Evolu tionary algorithm + domain knowledge = real-world evolutionary computation[J]. IEEE Transactions on Evolutionary Computation, 2006, 10(3): 256- 280.
  • 9Li P, Wendt M, Arellano-Garcia H, et al. Optimal operation of distillation processes under uncertain in flow streams accumulated in a feed tank[J].. AIChF. Journal, 2002, 48:1 198-1 211.
  • 10Cott B J, Macchietto S. Minimizing the effects of batch process variability using online scheduling modification[J]. Computers and Chemical Engineering, 1989, 13(1): 105-113.

二级参考文献20

  • 1张帆,李军,王钧,景宁.基于有效准则矢量生成的成像调度方法[J].航天控制,2005,23(6):81-84. 被引量:4
  • 2Michel V,Jin-Kao Hao.2003 upper bounds for the SPOT 5 daily photograph scheduling problem[J].Journal of Combinatorial Optimization,2003,7:87-103
  • 3Bensana E,et al.Exact and approximate methods for the daily management of an earth observation satellite[C].Proceedings of SpaceOps-96,Germany,1996
  • 4Harrison S A,Price M E.Task scheduling for satellite based imagery[C].Proceedings of the Eighteenth Workshop of the UK Planning and Scheduling Special Interest Group,University of Salford,UK,1999:64-78
  • 5Lin W C,et al,Daily imaging scheduling of an earth observation satellite,IEEE Transaction on Systems,Man,and Cybernetics part A:system and humans.March 2005,35(2):213-223
  • 6Muraoka H,et al.Aster observing scheduling algorithms[C]//Proceedings of SpaceOps-98,Tokyo,Japan,1998
  • 7Garey M,Johnson D.Computers and Intractablility:A Guide to the Theory of NP-Completeness[M].San Francisco:W.H.Freeman & Company,Publisher,1979:212-214
  • 8E.Zitzler M,Laumanns and L.Thiele.SPEA2:Improving the Strength Pareto Evolutionary Algorithm[M].Swiss Federal Institute of Technology(ETH),Zurich,Switzerland.Technical report TIK-Re-port 103,May.2001
  • 9Ferguson J C,Siemens R W,Wagner R F.STAR_PLAN:A Satellite Anomaly Resolution and Planning System[A].Proceedings of AAAI Workshop on Coupling Symbolic and Numerical Computing in Expert Systems[C],1985.
  • 10Britt Daniel L.Scheduling Spacecraft Operations[A].3rd Conference on Artificial Intelligence for Space Applications[C].NASA Publication 2492,Huntsville,AL.November,1987.

共引文献60

同被引文献64

引证文献3

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部