期刊文献+

国产超临界机组实现快速切负荷的若干技术问题探讨 被引量:12

Discussion of Technical Problems in FCB on Home-made Supercritical Units
下载PDF
导出
摘要 为了研究国产超临界机组实现机组快速切负荷(fast cut back,FCB)功能的可行性,分析了国产超临界机组的系统配置特点,结合国内已成功实施FCB试验的机组的经验教训,就国产机组在FCB功能实现中的难点进行了研究。研究结果表明:国产超临界机组实现FCB具有一定的可行性,但是在低容量旁路配置下避免锅炉超压、保持工质链和能量链的平衡、避免汽轮机超速以及给水系统过渡等问题上有待进一步的研究和改进。 For feasibility study of fast cut back(FCB) realization in home-made supercritical units,the system configuration characteristics thereof are analyzed.According to the experiences and lessons of successful implementation of FCB on domestic supercritical units,the difficulties of FCB realization in home-made units are studied.The result indicates that there is a certain feasibility to achieve FCB on home-made supercritical units,but further research and improvement on some issues are in need,which include how to avoid boiler overpressure under low-capacity bypass configuration,keep balance between working medium chain and energy chain,avoid turbine overspeed as well as the transition of water supply system.
作者 谭金
出处 《广东电力》 2010年第10期50-53,共4页 Guangdong Electric Power
关键词 机组快速切负荷 超临界机组 旁路系统 锅炉最大连续出力 fast cut back(FCB) supercritical unit bypass system boiler maximum continuous rating(BMCR)
  • 相关文献

参考文献5

二级参考文献1

  • 1GUANGDONG ZHUHAI POWER STATION MAINTAIN DOCUMENTS FOR I&C [S]. MITSUBISHI HEAVY INDUSTRIES. LTD, 1996

共引文献33

同被引文献69

引证文献12

二级引证文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部