期刊文献+

运力受扰的多车场车辆调度干扰管理问题研究 被引量:8

Study on Disruption Management for Vehicle Routing Problem with Break-down Vehicle
原文传递
导出
摘要 为解决物流配送系统中因运输车辆毁坏而产生的干扰问题,基于干扰管理思想提出了解决问题的扰动恢复策略与实施方案。在扰动度量的基础上,设计了多车场车辆调度扰动恢复策略,建立相应的干扰管理模型。针对多车场车辆调度干扰管理问题的特有属性,设计了一系列求解简化策略,有效简化了问题的求解空间。结合干扰管理模型的特点,使用改进的遗传算法进行求解。最后给出了一个算例,其结果证明了干扰管理模型与算法的有效性。 For solving the vehicle routing problem with disruption that may be vehicle breakdowns or traffic accidents in the logistics distribution system,the disruption recovery strategies and solution are given based on the theory of disruption management.Through disruption identification and measurement,the multiple-depot disruption recovery strategies are given and the disruption management model is built.For the attributes of the multiple-depot vehicle routing problem with disruption,a series of solving-simplify strategies are given to simplify the solution space.On the basis of the characteristic of the model,the improved genetic algorithm is designed to solve the problem.The representative result and analysis are given to prove the efficiency of the disruption management model and algorithm.
出处 《中国管理科学》 CSSCI 北大核心 2010年第6期82-88,共7页 Chinese Journal of Management Science
基金 国家自然科学基金项目(70671014 90924006 70890080 70890083)
关键词 干扰管理 车辆调度问题 运力受扰 求解简化策略 扰动恢复 disruption management vehicle routing problem transport capacity break-down solving-simplify strategies
  • 相关文献

参考文献17

  • 1胡祥培,丁秋雷,张漪,王旭坪.干扰管理研究评述[J].管理科学,2007,20(2):2-8. 被引量:41
  • 2Gutierrez-Jarpa, G., Desaulniers, G., Laporte, G., Marianov, V.. A branch-and-price algorithm for the vehicle routing problem with deliveries, selective pickups and time windows[J]. European Journal of Operational Research, 2010, 206(2).. 341-349.
  • 3Figliozzi M. A.. An iterative route construction and improvement algorithm for the vehicle routing problem with soft time windows [J]. Transportation Research Part C, 2010, 18(5): 668-679.
  • 4Muyldermans, L. , Pang, G.. On the benefits of co-collection: Experiments with a multi-compartment vehicle routing algorithm [J]. European Journal of Opera tional Research, 2010, 206(1): 93-103.
  • 5侯立文,谭家美,赵元.求解带时间窗的客户需求可分条件下的车辆路径问题[J].中国管理科学,2007,15(6):46-51. 被引量:18
  • 6王晓博,李一军.电子商务下基于改进两阶段算法的有时间窗车辆调度优化[J].中国管理科学,2007,15(6):52-59. 被引量:9
  • 7孟庆春,张江华.基于风险的考虑成本和允许等待的车辆运输调度问题研究[J].中国管理科学,2009,17(3):87-92. 被引量:5
  • 8Potivn, J. -Y. , Xu, Y. , Benyahia, I.. Vehicle rou ring and scheduling with dynamic travel times [J]. Computers and Operations Researeh, 2006, 33(5): 1129- 1137.
  • 9Taniguehi, E. , Shimajnoto, H.. Intelligent transportation system based dynamic vehicle routing and scheduling with variable travel times [J]. Transportation Researeh Part C, 2004, 12(3-4): 235-250.
  • 10Li, J. -Q. , Borenstein, D. , Mirchandani, P. B.. A decision support system for the single-depot vehicle rescheduling problem [J]. Computers and Operations Research, 2007, 34(4): 1008-1032.

二级参考文献121

共引文献93

同被引文献89

  • 1崔珊珊,陈宏,俆加胜.电商促销井喷需求下的应急商品配送研究[J].中国管理科学,2013,21(S1):141-147. 被引量:14
  • 2傅克俊,王旭坪,胡祥培.基于突发事件的物流配送过程建模构想[J].物流技术,2005,24(10):263-266. 被引量:14
  • 3王明春,高成修,曾永廷.VRPTW的扰动恢复及其TABUSEARCH算法[J].数学杂志,2006,26(2):231-236. 被引量:24
  • 4胡祥培,丁秋雷,张漪,王旭坪.干扰管理研究评述[J].管理科学,2007,20(2):2-8. 被引量:41
  • 5KohlN,Larsen A,Larsen J,et al. Airline disruption management -Perspectives, experiences and outlook [ J]. Journal of Air TransportManagement,2007,13(3) :149 -162.
  • 6Zhu G,Bard J F, Yu G. Disruption management for resource ~ con-strained project scheduling[ J]. Journal of the Operational ResearchSociety,2005,56(4) :365 -381.
  • 7Yang J,Qi X T,Yu G. Disruption management in production planning[J]. Navai Research Logistics,2005,52(5) :420 -442.
  • 8Chen K B, Shen J L,Feng M L. Disruptions management of a supplychain under strategic subsidy policy for the demand - stimulatinginventory [ J ]. Computers & Industrial Engineering, 2014,76 (76):169 -182.
  • 9Chen K B,Shen J L,Feng M L. Disruptions management of a supplychain under strategic subsidy policy for the demand - stimulatinginventory[ J]. Computers & Industrial Engineering,2014,76: 169 -182.
  • 10Lee C Y, Yu G. Parallel - machine scheduling under potential dismp-tion[ J]. Optimization Letters,2008,2(1) :27 -37.

引证文献8

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部