期刊文献+

基于模拟逐次逼近算法的梯级水电站群优化调度图研究 被引量:28

Link the simulation with dynamic programming successive approximations to the study on optimal operation chart of cascade reservoirs
原文传递
导出
摘要 水库调度图是水电站发电调度运行的基础,然而现有研究和算法大都集中在单库调度图,库群发电调度图成果较少。本文结合我国开发得较为完善的乌江流域梯级水电站群,提出了一种实用的梯级水电站群发电优化调度图制定方法。该方法以单库调度图为基础,综合形成初始的库群调度图,并以此进行模拟调度,即根据两种调度图对长系列资料逐时段计算,获得两种负荷结果,最终运用库群负荷分配调整两种负荷的偏差,获得调度结果;然后以模拟调度统计的多年平均发电量最大为目标,采用逐次逼近算法不断修正两种调度图的基本调度线,最终获得满足精度要求的单库调度图和库群调度图。较常规方法,本方法方便一次性得出水电站(群)调度图。模拟调度结果表明所建立的方法有效、实用,在兼顾电网对电站要求的基础上,大大提高了梯级长期发电效益。 Hydroelectric plant operation is based on an operation chart.Most of the existing literatures,however,paid much more attention to the single reservoir chart than cascade reservoirs.In this paper,an approach of working out the optimal operation chart for cascade reservoirs is proposed and applied to the well-developed Wujiang River hydropower system in China.Based on the initial traditional operation charts for single reservoir and cascade reservoirs,power results of each single plant and the cascade system are obtained.Then the load dispatching strategy of cascade reservoirs is adopted to regulate the power variance between the sum power of all the single plants and the power of cascade system.By repeating this procedure,the simulated runoff history is obtained.Finally a dynamic programming successive approximation(DPSA) is used to modify the basic parameters of the two charts at an objective of energy maximizing.In comparison with the traditional effort,this approach can give an integrated optimal operation charts for single reservoirs and cascade system.Simulation results indicate that the proposed approach is valuable and feasible and it significantly improves the power generation benefit under the power grid requirements.
出处 《水力发电学报》 EI CSCD 北大核心 2010年第6期71-77,共7页 Journal of Hydroelectric Engineering
基金 国家自然科学基金资助项目(50679011) "973"计划前期研究专项(2009CB226111)
关键词 调度图 梯级电站 逐次逼近 模拟 operation chart cascade reservoirs DPSA simulation
  • 相关文献

参考文献7

二级参考文献25

  • 1万俊.大系统分解协调技术及DDDP算法在水库群优化补偿调节中的联合应用[J].水利水电技术,1994,25(5):2-5. 被引量:2
  • 2尹正杰,胡铁松,崔远来,王小林,曾志炫.水库多目标供水调度规则研究[J].水科学进展,2005,16(6):875-880. 被引量:41
  • 3陈洋波,水电能源科学,1990年,8卷,3期
  • 4袁作新 白宪台.灌溉水库兴利调度图的编制方法[J].武汉水利电力学院学报,1978,(3):13-20.
  • 5王平.灌溉水库兴利调度图长系列计算方法的改进[J].中国农村水利水电,1997(7):24-27. 被引量:20
  • 6Oliveira R,Loucks D P.Operating rules for multireservoir systems [J].Water Resources Research,1997,33(4):839-852.
  • 7Wardlaw R,Sharif M.Evaluation of genetic algorithms for optimal reservoir system operation [J].Journal of Water Resources Planning and Management,1999,125(1):25-33.
  • 8Reed P,Minsker B,Goldberg D E.Designing a competent simple genetic algorithm for search and optimization [J].Water Resources Research,2000,36(12):3757-3761.
  • 9袁作新 白宪台.灌溉水库兴利调度图编制方法[J].武汉水利电力学院学报,1978,3.
  • 10Oliveira R,Locks D P.Operating rules for multireservoir systems[J].Water Resour Res,1997,33(4):839-852.

共引文献63

同被引文献273

引证文献28

二级引证文献204

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部