摘要
针对浮式钻井装置的隔水管张紧问题,提出了几种解决方案,并对方案的补偿原理做了分析研究,同时也对DAT隔水管张紧系统设计作了阐述。
This paper proposes several solutions for riser tensiolung of floating dnllmg umt, and discusses the compensation mechanisms behind each solution, which also serves as a summary for the design of DAT riser tensioning system.
出处
《上海造船》
2010年第4期1-5,共5页
Shanghai Shipbuilding
关键词
浮式钻井装置
隔水管
张紧系统
floating drilling unit
riser
tensiomng system