期刊文献+

保定矿区群桩基础的沉降计算与分析

Baoding Mining Settlement of Pile Groups Based on Calculation and Analysis
原文传递
导出
摘要 群桩沉降计算是一个传统课题,对群桩的沉降计算方法也有很多,但是计算结果与实测结果相比相差很大。本文利用等代墩基法和三维弹性有限元法对保定一高层建筑进行沉降量计算,并结合保定地区地层地质特点与实测结果进行比较分析。 Settlement of pile groups is a traditional subject, the method for settlement of pile grqups, there are many, but the results varied widely compared with the measured results. In this paper, and so on behalf of the pier base method and three-dimensional elastic finite element method, Baoding, a high-rise building for settlement calculations, combined with a number of stratum Baoding surrounding geological features were compared with measured results
作者 陈静
出处 《煤炭技术》 CAS 北大核心 2011年第1期125-127,共3页 Coal Technology
关键词 群桩基础 三维弹性有限元 群桩基础沉降 pile foundation three-dimensional elastic finite element settlement of pile
  • 相关文献

参考文献5

  • 1中华人民共和国国家标准.建筑地基基础设计规范GB50007[S].北京:中国建筑工业出版社,2002.
  • 2华南理工大学等四院校编.基础工程[M].北京:中国建筑工业出版社,2003.
  • 3刘金砺.桩基础设计与计算[M].北京:中国建筑工业出版社,1994..
  • 4陈权.ADINA应用基础与实例祥解[M].北京:人民交通出版社,2008.
  • 5江山,王玉林.桩基静载荷试验应变测量及应用[J].煤炭技术,2008,27(4):80-82. 被引量:2

共引文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部