贺庄橡胶坝工程建设综合后评价

Comprehensive Post-evaluation of Hezhuang Rubber Dam Engineering Construction
下载PDF
导出
摘要 构建了橡胶坝工程建设综合后评价的指标体系,建立了合理的后评价数学模型,并以贺庄橡胶坝工程建设为实例,应用多目标模糊层次分析法对其进行了综合后评价。该方法将定性指标数量化及各项指标的无量纲化,使定性指标和定量指标有机的结合起来,从而更准确、直观地反映橡胶坝建设项目的成功度,对实际的橡胶坝工程后评价有一定实用价值。 In this paper,the index system of comprehensive post-evaluation on a rubber dam construction project has been constructed and a reasonable mathematical model of post-evaluation has been established, then take Hezhuang rubber dam for example, comprehensive post-evaluates it using multi-target FAHP. The method puts forward qualitative indicators into quantity and makes indexes nondimensional, also makes qualitative and quantitative indicators combine organically,thereby it makes reflecting of the rubber dam projects success more accurately and directly,it has practical value to the post-evaluation of actual rubber dam engineering.
作者 张雷
出处 《地下水》 2011年第1期178-181,共4页 Ground water
关键词 后评价 橡胶坝工程 模糊综合评价 贺庄 post-evaluation rubber dam engineering fuzzy analytic hierarchy process(FAHP) Hezhuang
  • 相关文献

参考文献5

二级参考文献7

  • 1袁峰.机构改革──降低政府成本[J].党政论坛,1998(6):29-31. 被引量:2
  • 2卓越.行政成本的制度分析[J].中国行政管理,2001(3):50-54. 被引量:73
  • 3胡家勇.我国政府规模的系统分析[J].经济研究,1996,31(2):31-36. 被引量:15
  • 4[2]陈东琪.社会主义市场经济学[M].长沙:湖南人民出版社,2000.
  • 5[4]黄天民.应用模糊数学[M].成都:西南交通大学出版社,1997.
  • 6[5]Djoen San SANTOSO, Stephen O. OGUNLANA, Takayuki MINATO. Perceptions of Risk Based on Level of Experience for Highrise Building Contractors [ J ]. The International Journal of Construction Management, 2003,3 (3): 49-62.
  • 7[7]Mulholland B, Christian J. Risk Assessment in Construction Schedules[J ], Journal of Construction And Management, 1999, 125(1) :57-61.

共引文献90

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部