通过对龙羊峡水轮发电机组运行性能与试验成果分析研究,认为该机组额定出力由320MW 增容到350MW
Through the analysis and research of operation performance and test results for Longyangxia turbine genenating unit, it is considered feasible that the output of the unit may be increased from 320MW to 350MW.