摘要
长距离岩石层穿越是当今水平定向钻穿越施工的难点。文章结合山东白马、吉利河1310m岩石层定向钻穿越工程,在分析了穿越工程技术难点的基础上,论述了采用预埋套管、保护控向线挡圈、落井牙轮打捞新装置、导向浮筒装置、人工磁场监测、双钻机同步复式扩孔等工艺,成功地实现了岩石层穿越的施工过程。
Nowadays,long-distance crossing in rocky stratum is still a difficult construction key point in horizontal directional drilling.In the project of 1 310 m long pipeline crossing Baima River and Jili River in Shandong Province with directional drilling in rocky stratum,based on analyzing technical difficulties,a series of techniques were adopted,including pre-embedded casing,retaining ring for protecting direction control wire,new device for fishing gear wheel,guide buoys,artificial magnetic field monitor,synchronized multiple reaming with dual drillers.The pipeline crossing in rocky stratum was fulfilled successfully.
出处
《石油工程建设》
2011年第1期47-49,8,共3页
Petroleum Engineering Construction
关键词
岩石层
水平定向钻穿越
施工工艺
rocky stratum
crossing with horizontal directional drilling
construction process