摘要
介绍徐浦大桥高强螺栓连接施工中出现的问题,分析其原因,提出了质量保证措施.
This paper illustrates some problem existing at connections with high tension connecting bolt in Xupu Bridge. The paper also analyzed the causes of the problem and proposes measurds of quality guaranty.
出处
《钢结构》
1999年第3期45-47,共3页
Steel Construction
关键词
结合梁
高强螺栓连接
质量保证
斜拉桥
combination beam
high tension connecting bolt
quality control