期刊文献+

产能不确定环境下多供应商横向协同问题研究 被引量:6

Research on Horizontal Collaboration Among Multi-suppliers with Uncertain Yield
下载PDF
导出
摘要 为了减轻零部件产能不确定性所造成的制造商过高库存成本的影响,采用信息共享或者加班赶工及资源外包的方式,建立了多个供应商之间的两种横向协同模型,减量模型和增量模型。通过数据仿真的结果显示,相比于非协同模型,这两种协同模型能够明显地降低制造商的缺货成本和购买成本,同时消除了多余未齐套零部件的库存持有成本,最终有效地降低了制造商的期望总库存成本。 To relieve uncertain components capacity's impact on the manufacturer's higher inventory cost,using information sharing or expediting and outsourcing,presented two horizontal collaboration models among multi-suppliers:deduction model and increment model.Through data simulation,compared with the non-collaborative model,the result showed that these two collaborative models could decrease the shortage cost and purchase cost of manufacturer,eliminate the holding cost of excess unseted components,and finally effectively decrease the manufacturer's expected total inventory cost.
出处 《工业工程与管理》 北大核心 2011年第1期37-40,共4页 Industrial Engineering and Management
基金 国家自然科学基金资助项目(71072035)
关键词 按订单装配 横向协同 产能不确定 ATO horizontal collaboration uncertain capacity
  • 相关文献

参考文献8

  • 1Simatupang,et al.Case study:Supply chain coordination in a fashion firm[J].Supply Chain Management:An International Journal,2004,9(3):256-268.
  • 2Gupta D,Weerawat W.Supplier-manufacturer coordination in capacitated two-stage supply chains[J].European Journal of Operational Research,2006,175:67-89.
  • 3Giarda V.Mendy G.Scheduling coordination in a supply chain using advance demand information[J].Production Planning & Control,2008,19(7):655-667.
  • 4Kim B,Heungshik Q The impact of decision-making sharing between supplier and manufaeturer on their collaboration performance[J].Supply Chain Management:An International Journal,2005,10(3):223-236.
  • 5程海芳,张子刚.多供应商条件下集成供应商订货模型研究[J].工业工程与管理,2004,9(4):27-30. 被引量:19
  • 6曾文杰,马士华.供应链合作关系相关因素对协同的影响研究[J].工业工程与管理,2010,15(2):1-7. 被引量:33
  • 7Hsu V N,Lee C Y,So K C.Optimal component stocking policy for assemble-to-ordersystemswith lead-time-dependent component and product pricing[J].Management Science,2006,52(3):337-351.
  • 8Gerchak Y,Vickson R G,Padar M.Periodic renew production models with variable yields and uncertain demand[J].IIE Transactions,1988,20(2),144-150.

二级参考文献22

  • 1张翠华,任金玉,于海斌.供应链协同管理的研究进展[J].系统工程,2005,23(4):1-6. 被引量:73
  • 2凌鸿,袁伟,胥正川,周江波.企业供应链协同影响因素研究[J].物流科技,2006,29(3):92-96. 被引量:27
  • 3Sabath R E,Fontanella J.The unfulfilled promise of supply chain collaboration[J].Supply Chain Management Review,2002,6(4):24-29.
  • 4Daugherty P J,Richey R G,Roath A S,et al.Is collaboration paying off for firms[J].Business Horizons,2006,49:61-70.
  • 5Akkermans H,Bogerd P,Doremalen J.Travail,transparency and trust:a case study of computer-supported collaborative supply chain planning in high-tech electronics[J].European Journal of Operational research,2004,153:445-456.
  • 6Quinn F J.Collaboration:more than just technology[J].ASCET,2001,6(3).http:∥www.ascet.com.
  • 7Fynes B,Voss C.The moderating effect of buyer-supplier relationships on quality practices and performance[J].International Journal of Operations and Production Management,2002,22(6):589-613.
  • 8Fynes B,Voss C,Burca S.The impact of supply chain relationship quality on quality performance[J].International Journal of Production Economics,2005,96:339-354.
  • 9Anderson J C,Narus J A.A model of distributor firm and manufacturer firm working partnerships[J].Journal of Marketing,1990,54(1):42-58.
  • 10Mohr J,Spekman R.Characteristics of partnership success:partnership attributes,communication,and conflict resolution techniques[J].Strategic Management Journal,1994,15(2):135-152.

共引文献50

同被引文献43

  • 1李贵萍.基于前景理论的单周期定价与订购联合决策模型[J].中国管理科学,2013,21(S2):502-507. 被引量:2
  • 2肖勇波,陈剑,吴鹏.产能和需求不确定情形下ATO系统最优库存和生产决策研究[J].中国管理科学,2007,15(5):56-64. 被引量:20
  • 3Tuomikangas N, Kaipia R. A coordination frame- work for sales and operations planning: synthesis from the lit- erature [ J ]. International Journal of Production Economics, 2014,154(1) : 243 -262.
  • 4Pezeshki Y, Baboli A, Cheikhrouhou N. A rewarding punishing coordination mechanism based on trust in a diver- gent supply chain [ J ]. European Journal of Operational Re-search,2013,230( 1 ) :527 - 538.
  • 5Low C,Chang C M, Li R K. Coordination of pro- duction scheduling and delivery problems with heterogeneous fleet [ J ]. International Journal of Production Economics, 2014,153(1) :139 - 148.
  • 6Marcel Korte. Confidence in software cost estimation results based on MMRE and PRED[A].2008.63-70.
  • 7Gupta D,Weerewat W. Supplier-manufacturer coordination in capacitated two-stage supply chains[J].European Journal of Operational Research,2006,(175):67-89.
  • 8Timmerman E. An approach to vendor performance evaluation[J].Journal of Purchasing and Supply Management,1986,(22):2-8.
  • 9Monczka R M,Trecha S J. cost-based supplier performance evaluation[J].Journal of Purchasing and Supply Management,1988,(24):2-7.
  • 10Roodhoft F,Kongings J. vendor selection and evaluation an activity based costing approach[J].European Journal of Operational Research,1996,(96):97-102.

引证文献6

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部