木寨岭隧道7~#斜井试验段信息化施工 被引量:5

Information-aided Construction of Trial Section in No.7 Inclined Shaft of Muzhailing Tunnel
下载PDF
导出
摘要 为积累指导正洞的施工经验,结合木寨岭隧道斜井炭质板岩段控制高地应力大变形的方法,通过在斜井进行模拟正洞试验段信息化施工,从施工、支护、初期支护结构内力、变形发展进行分析探讨,得出采用分层分次支护、提高拱架强度、加强锚杆施作以及完善的施工工艺等措施能有效控制变形。 Information-aided construction is executed in the trial section of No.7 inclined shaft of Muzhailing tunnel,which is located in carbonaceous slate strata with high ground stress,to simulate the construction of the main tunnel so as to accumulate experience for the main tunnel construction.Analysis is made in terms of construction,support,internal force of the primary support structure and deformation development.Conclusion is drawn that the deformation can be effectively controlled if countermeasures,such as supporting step by step and layer by layer,improving the strength of the steel ribs,strengthening the rockbolting and perfect construction techniques,are taken.
作者 南建民
出处 《隧道建设》 2011年第1期88-90,109,共4页 Tunnel Construction
关键词 木寨岭隧道 斜井 试验段 信息化施工 炭质板岩 Muzhailing tunnel inclined shaft trial section information-aided construction carbonaceous slate
  • 相关文献

参考文献8

二级参考文献24

共引文献151

同被引文献43

引证文献5

二级引证文献55

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部