寒山大桥吊杆二次张拉索力计算 被引量:2

Boom Secondary Cable-Adjustment Calculation of Hanshan Bridge
下载PDF
导出
摘要 为增大结构的安全储备并保证主梁受力合理,通常系杆拱桥施工中对吊杆采用2次张拉,使其达到设计成桥索力。该文以寒山大桥为例,提出了吊杆2次张拉的施张拉力、顺序的计算问题,以影响矩阵理论为基础,建立了2次张拉最优控制的数学模型,采用惩罚函数法求解,该方法计算精确、简便、实用,是一种较为理想的计算方法。 In order to improve the structure security and guarantee the girder appropriate force in the construction of tied-arch bridges, cables should be tensioned twice and then the expected completed cable can be achieved at last. A good method was proposed to calculate the cable tension forces and the adjusted order for Hanshan Bridge. Based on the theory of influence matrix, an optimized control model to solve the second cable adjustment was established, and method of penalty function was used. This method had many advantages, such as good solution, convenience and practice etc. So it is a imagining method of funiculus.
出处 《现代交通技术》 2011年第1期28-31,共4页 Modern Transportation Technology
关键词 桥梁工程 影响矩阵法 惩罚函数法 2次张拉 成桥索力 bridge engineering influence matrix method penalty function method secondary tension completed cable
  • 相关文献

参考文献5

二级参考文献6

  • 1陈金旺.[D].大连:大连理工大学,1988.
  • 2张可村.工程优化的算法与分析[M].西安:西安交通大学出版社,1998..
  • 3Saric, Andrija T.; Calovic, Milan S.; Strezoski, Vladimir C. Fuzzy multi - objective algorithm for multiple solution of distribution systems voltage control[ J]. International Journal of Electrical Power and Energy Systems,2003,25(2): 145 - 153.
  • 4WANG Pao - Hsii, YANG Chiung - Guei. Parametric studies on cable - stayed bridges [ J ]. Computers and Structures. 1996,60 (2) :243 - 260.
  • 5赵光明,陈科昌.系杆拱桥调索工序时机选择[J].中南公路工程,1997,22(1):28-31. 被引量:18
  • 6肖汝诚,项海帆.斜拉桥索力优化及其工程应用[J].计算力学学报,1998,15(1):118-126. 被引量:153