摘要 针对边坡工程中超前支护结构未充分发挥岩土体自身抗剪能力的问题,通过对支护结构与边坡体耦合作用机理的分析,提出了一种主动减压超前支护结构型式,主要由柔性填料和超前支护结构组成。柔性填料的设置和厚度是主动减压超前支护结构设计的两个关键问题。一方面,柔性填料的设置在支护施工时要保证主动减压超前支护结构两个组成部分互不影响;另一方面,柔性填料的设计厚度要能保证边坡岩土体充分发挥自身抗剪能力,使得边坡体下滑推力由目前超前支护结构独自承担向超前支护结构和岩土体共同承担转变,此时超前支护结构承受的推力最小,从而达到主动减压的效果。最后以工程实例说明了柔性填料厚度的计算过程,得到了比较合理的计算结果。 In slope engineering,the shear resistance of rock and soil can never be exerted themselves by general pre-reinforced structure,through the coupling mechanism between reinforced structure and slope,an initiative decompression pre-reinforced structure consists of soft stuffing and pre-reinforced structure is presented.The setting and thickness of soft stuffing are both key questions during the design of initiative decompression pre-reinforced structure.On one hand,the setting of soft stuffing assure that parts of initiative decompression pre-reinforced structure cannot interact each other under reinforcing;on the other hand,the thickness of soft stuffing can assure that the shear resistance of rock and soil can be exerted by themselves,the sliding thrust which is endured by pre-reinforced structure alone is changed to be endured by soil and pre-reinforced structure together.Then the sliding thrust endured by pre-reinforced structure minimizes,accordingly the effect of initiative decompression is achieved.In the end,the calculation procedure of thickness is illustrated by a practical project and the result is rational.
出处 《重庆大学学报(自然科学版)》 EI CAS CSCD 北大核心 2011年第3期126-131,共6页 Journal of Chongqing University
基金 国家自然科学基金(50979112) 重庆市自然科学基金项目资助(2008BB6144)
关键词 边坡工程 主动减压 柔性填料 超前支护 应变软化 施工 slope engineering initiative decompression soft stuffing pre-reinforced structure strain softening construction
  • 相关文献

参考文献17

  • 1何思明,李新坡.高切坡超前支护桩作用机制研究[J].四川大学学报(工程科学版),2008,40(3):43-46. 被引量:14
  • 2田金昌,张正波,何思明,周建庭.人工边坡超前文护研究及其应用[J].西藏科技,2007(12):62-66. 被引量:2
  • 3宋林辉,梅国雄,宰金珉,赵建平.考虑位移的土压力理论在支护桩受力分析中的应用[J].工程力学,2008,25(5):91-96. 被引量:6
  • 4FANG Y S, ISHIBASHI I. Static earth pressure with various wall movements [J]. Journal of Geotechnical Engineering, 1986, 112(3):317-333.
  • 5FANG Y, ISHIBASHI I. Static earth pressure with various wall movement [J]. Journal of Geoteehnieal Engineering, 1986, 112(3): 317-333.
  • 6MITTAL S, GARG K G, SARAN S. Analysis and design of retaining wall having reinforced cohesive frictional backfill [ J ]. Geotechnical and Geological Engineering, 2006, 24: 499-522.
  • 7DONOVAN J G, KARFAKIS M G. Design of backfilled thin seam coal pillars using earth pressure theory[J]. Geotechnical and Geological Engineering, 2004, 22(4): 627-642.
  • 8顾安全,吕镇锋,姜峰林,杨忠.高填土盖板涵EPS板减荷试验及设计方法[J].岩土工程学报,2009,31(10):1481-1486. 被引量:53
  • 9VASLESTADJ, JOHANSEN T H, TOLM W. Load reduction on rigid culverts beneath high fills long term behavior [R]. Transportation Research Record No. 1415,1993.
  • 10OKABAYASHI K, OHTAMI W. Centrifugal model test for reducing earth underground structure pressure on the culvert by using the flexible material [C] // Proceeding of the Fourth International Offshore and Polar Engineering Conference, April 10-15, 1994 Osaka, Japan. [S.I. ]: ISOPE,1994:620-624.