期刊文献+

监控量测在西庄隧道施工中的应用 被引量:1

Application of monitoring and measurement in Xizhuang tunnel construction
下载PDF
导出
摘要 以太佳高速公路第八合同段隧道工程为例,详细阐述了监控量测在隧道施工中的具体实施方案,并以实测资料为基础,对数据进行线性回归分析,反映隧道开挖后在一定时间内围岩收敛变形与时间的关系,及时了解和掌握隧道围岩的稳定状况,为指导施工及变更支护设计参数提供指导。 Taking the eighth contracting tunnel project of Tai-Jia highway as the case, it specifically the specific implementation scheme of monitoring and measurement in tunnel construction. Based on actual measuring data, it carries on linear regression analysis on the data, which re- flects the relation of surrounding rock convergence deformation and time in certain time after the tunnel excavation. As a matter of fact, it timely understand the stability condition of tunnel surrounding rock, which has provided guidance for construction and changing support design parameter.
作者 肖荣 邹仕奇
出处 《山西建筑》 2011年第11期173-174,共2页 Shanxi Architecture
关键词 监控量测 隧道 线性回归分析 monitoring and measurement, tunnel, linear regression analysis
  • 相关文献

参考文献4

  • 1中华人民共和国交通运输部,公路隧道设计规范[S].
  • 2中华人民共和国交通运输部,公路隧道施工技术规范[S].
  • 3李晓红.隧道新奥法及其量测技术[J].北京:科学出版社,2009.
  • 4交通部质监总站.隧道工程试验检测技术[M].北京:人民交通出版社.2001.

共引文献1

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部